Formula 1

Formula 1

Location

F1 Pit Building

Specifications

To provide temporary event flooring and walking pathway for an outdoor venue.

Solution

TrackGard® was used to create a temporary event area and pedestrian pathway at F1 Pit Building to accommodate event goers for the Formula 1 Night Race.

The hexagonal design of each tile allows for interlocking supports on all six sides to provide excellent strength and durability for heavy foot traffic.  The non-slip surface of the TrackGard® reduced possibilities of accidental slipping during periods of rainfall.

Read more

Standard Chartered Singapore Marathon

Location

Padang, Singapore

Specifications

To provide temporary ground cover and walking pathway for Standard Chartered Singapore Marathon.

Solution

TrackGard® was used to create a temporary footpath and race village area at Padang, accommodating over 48,000 Standard Chartered Singapore Marathon runners.

The hexagonal design of each tile allows for interlocking supports on all six sides to provide excellent strength and durability for heavy foot traffic.

TrackGard® also served as a markup of the different areas within the race village including a designated parking area for authorised heavy vehicles. The non-slip surface of the TrackGard® also prevented accidental slipping due to wet floor conditions brought about by the rain and provided a mud-free walkway for runners.

Read more

Hy-Tex (UK) Limited Headquarters, Ashford United Kingdom

Location

Aldington, Ashford, Kent, UK

Specifications

To provide a green wall system to improve the entrance to their offices, add visual interest and reduce the environmental impact of a warehouse in a rural location.

Solution

Elmich VersiWall® GP (VGP) was used to establish a living wall with dimensions of 4.8m (width) by 2.4m (height), totalling 11.5 square metres. The living wall comprised of 200 VGP 2060 trays mounted on a 75mm weld mesh panel framework suspended on mesh brackets, which are secured to a Unistrut metal framing system bolted to the building.

Inadvertent dislodgment of the VGP trays by inclement weather was prevented by the insertion of anti-lift arms into the hooks of the trays, effectively locking the trays to the mounting panel. An automated drip irrigation system was incorporated to deliver irrigation and nutrients to the plants in the individual trays on the wall at programmed intervals for pre-set durations with the aid of a control panel.


The trays are then planted with different hues of Heucheras to achieve the desired aesthetic effect.

Read more
Waterproof membrane on building

DUO

Location

Bugis/Ophir Road, Singapore

Specifications

To provide waterproofing for flat roofs, landscape roofs, planter boxes, internal & external wet areas and basement.

Solution

EVALON® – 35,500 sqm for landscape roofs, planter boxes and flat roofs.

Fleximent® 201 – 78,000 sqm of internal and external wet areas.

Eurathane® 2000 – 900 sqm of internal and external wet areas.

Eurathane® 3000 – 600 sqm for green roof on metal structure

VersiCell® – For planter box and drainage.

Click here for project write-up

Read more

MAHA BODHI SCHOOL

Location

10 Ubi Avenue 1, Singapore

Specifications

To provide green wall system for installation of two green walls.

Solution

Welded wire mesh was installed onto two walls to support the mounting of VersiWall® GP (VGP) trays according to the plant design. A drip irrigation system was incorporated in the system and a drainage gully installed at the base of the walls to collect and channel excess water.

Approximately 1,500 VGP trays were used to establish the 6 metres high green walls which created an impressive façade to accentuate the school’s crest. Furthermore, incorporating nature offers children a healthy environment and a better quality of life through its contribution to environmental sustainability and a source of stress relief for the eye-strained students.

Read more

FORD AVENUE PRIVATE RESIDENCE

Location

Ford Avenue, Singapore

Specifications

To provide pedestal system for raised decking installed at swimming pool surrounds.

To provide paver supports for installation of raised walkway pavers.

Solution

Decking

VersiJack® pedestals support the timber bearers for the installation of raised deck flooring surrounding the swimming pool.

Bearer holders attached to the pedestals were used to keep the timber joists firmly in place prior to and during installation of the decking.

The void under the raised decked areas allow essential pipes and services to be unobtrusively hidden and assist surface water to drain away quickly which is especially important around a swimming pool.

Paving

VersiJack® pedestals support raised pavers for the creation of a side walkway of the house concealing any unsightly services beneath. Necessary adjustments for slope and height were made with the Slope Corrector and locking ring system in the pedestal respectively to create level flooring. The gaps, created by using Spacer Tabs on the pedestals, between the pavers facilitate drainage of water from the pavers back into the water feature.

Read more

SMU SCHOOL OF LAW

Location

Armenian Street, Singapore

Specifications

To provide waterproofing for flat roofs, landscape roofs, planter boxes, internal & external wet areas and basement.

Solution

Bitulen® SK374 – 240 sqm for ground.

Delta® MS 20 – 3,040 sqm for water management application (between slabs drainage) to basement slab.

Delta® Terrax – 1,140 sqm for drainage.

EVALON® – 6,320 sqm for landscape roofs, planter boxes and flat roofs.

Fleximent® 201 – 8,768 sqm of internal and external wet areas.

VersiCell® – 3,688 sqm for drainage.

VersiDrain®  6P – 12,400 sqm for drainage

Read more

FLO RESIDENCE

Location

Punggol Field Walk, Singapore

Specifications

To provide the pedestal system to support installation of pavers surrounding the swimming pool.

Solution

VersiJack® height and slope adjustable pedestals were used to support heavy 600 mm X 600 mm granite pavers surrounding the swimming pool of the condominium.

The use of Spacer Tabs secured on the top of the Elmich pedestal enabled constant gaps between pavers. This application eliminated the need for surface drains and allowed surface water to drain away rapidly, keeping the pavers dry for the safety of the residents and visitors.

As the installation surface was sloped, Slope Correctors were used to allow adjustments of up to 5% to maintain a level pool deck.

Moreover, the raised pool deck enabled essential M&E service pipes to be hidden in the void space created beneath the raised pavers. During maintenance and repair work, workers can easily access these service pipes by lifting the pavers, saving time and cost instead of being subjected to the risks of removing embedded pavers.

In addition, VersiJack®’s resistance to mould and algae makes it the perfect choice when used in wet areas.

Elmich Pedestals provide a very practical solution for desirable pool decks for different kind of projects with its versatile height range and models.

Read more

The Brunei Cancer Centre, Brunei

Location

Jerudong Park, Brunei Darussalam

Specifications

To provide a complete waterproofing system for landscape decks, planter boxes, basement and wet areas.

Solution

Evalon® & Evalon® V – 28,000 sqm for waterproofing of planter boxes.

VersiCell® – 740 sqm for drainage of planter boxes.

VersiDrain® 6P – 15,600 sqm for under-screed drainage to prevent efflorescence for tiled walkways.

Eurathane® 2000  – 3,200 sqm for basement and ground.

Fleximent® 201  – 6,400 sqm for wet areas and treatment rooms.

Bitulen® SK374  – 2,400 sqm for basement and ground.

Read more

ALOHA LOYANG

Location

Pasir Ris, Singapore

Specifications

To provide a rainwater retention solution to harvest and reuse water for irrigation.

Solution

Large pits were excavated to specification on-site. The base of each pit is compacted and leveled with a layer of coarse sand and lined with an impermeable membrane.

190 sets of VersiTank® units were then assembled on-site and positioned in the two respective pit locations.

Subsequently, the tanks were covered over with geotextile lapped and sealed at all joints to envelope the entire exposed tank surface area.

The retained rainwater is used for irrigation of surrounding turf and landscape.

Retention of rainwater also prolongs the residence time of run-off during torrential downpours, effectively reducing the incidence of waterlogging or ponding.

Read more