Bukit Canberra Integrated Hub

Bukit Canberra Integrated Hub - Green Spaces

Bukit Canberra Integrated Hub

Location

Bukit Canberra Integrated Hub, Singapore

Specifications

  1. Establish Fire Engine Accessway at Community Lawn
  2. Provide Drainage System Beneath Intensive and Extensive Green Roofs
  3. Establish Sustainable Stormwater Management System

Solution

Establish Fire Engine Accessway at Community Lawn (Image 1)
Emergency fire engine access areas were created on the community lawn using TurfPave® XD grass pavers installed beneath the ground. TurfPave® XD’s porous structure allows rainwater to infiltrate the ground, protecting the grass roots against compaction and effectively supporting loads imposed by large fire trucks and human traffic.

Provide Drainage System Beneath Intensive Green Roofs (Image 2 to 4)
VersiCell® lightweight, high strength modular drainage cells were installed beneath the planting soil at the butterfly garden on level 2 and therapeutic gardens on the roof terraces on level 3 to facilitate efficient drainage of excess water, preventing waterlogging. Additionally, drip irrigation systems were added to ensure the health of the vegetation.

Provide Drainage System Beneath Extensive Green Roofs (Image 5 to 12)
VersiCell® lightweight, high strength modular drainage cells were also installed beneath the top planting media on the building’s structure, pick-up/drop-off point shelter, and covered walkways to facilitate efficient drainage of excess water, preventing waterlogging. Additionally, drip irrigation systems were added to ensure the health of the vegetation.

Establish Sustainable Stormwater Management System (Image 13 to 16)
VersiTank® modular detention/retention tanks were assembled to construct ABC Waters design features, such as bioretention basins, earth drains and bioswales, that aid in sustainable stormwater management.

 

Project Credits
Owner: Sport Singapore
Architect: DP Architects Pte Ltd
Landscape Consultant: Henning Larsen Singapore
Façade Consultant: Arup Singapore
Main Contractor: China Construction (South Pacific) Development Co. Pte Ltd
TurfPave® XD / VersiCell® / VersiTank® Installer: Nature Landscapes Pte Ltd

References
DP Architects, “Design in Print 14.1 – The Green-Well-Tech Issue”, Pg 63, 2023, via https://issuu.com/dparchitects/docs/dipvol14.1_gwt-20231230

Read more
Solar Green Roof

Solar Green Roof at Pulau Ubin

Location

Pulau Ubin, Singapore

Specifications

To construct a Green Roof system beneath solar panels on the metal roof.

Solution

  1. VersiDrain® 30 trays, VersiEdge™ and EnviroMix® GR were hoisted onto the metal roof.
  2. VersiEdge™ was installed along the edges of the metal roof to create a vertical barrier to retain media and prevent erosion.
  3. 1,700 m2 of VersiDrain® 30 trays (water retention and drainage layers) were installed and solar panel substructure was bolted on the metal roof.
  4. Geotextile was laid on top of VersiDrain® 30 trays and EnviroMix® GR planting media spread over entire planting area.
  5. Planting and backfilling.
  6. Installation of rails of solar panel substructure.
  7. Installation of Photovoltaic Modules.
  8. Completion of Green Solar Roof.

 

Project Credits
Main Contractor: Sunseap Energy Ventures Pte Ltd

News Article:
https://www.straitstimes.com/singapore/environment/pulau-ubin-to-derive-up-to-95-per-cent-of-electricity-needs-from-solar-power

Reference Article:
https://www.edpr.com/apac/en/news/edp-renewables-apac-greenifies-pulau-ubins-micro-grid

Read more

POSB PAssion Run For Kids

Location

The Promontory @ Marina Bay, Singapore

Specifications

To provide temporary ground cover for event areas and pedestrian pathways for participants.

Solution

TrackGard® was deployed within the vicinities of The Promontory @ Marina Bay to create temporary event areas and pedestrian pathways.

The hexagonal design of each TrackGard® tile allows for interlocking supports on all six sides to provide excellent strength and durability for heavy foot traffic. The non-slip surface of TrackGard® prevented accidental slipping due to wet floor conditions brought about by the rain and provided a mud-free walkway for participants.

Read more

The Gate Hotel Tokyo By Hulic, Japan

Location

The Gate Hotel Tokyo By Hulic, Japan

Specifications

To establish an outdoor raised floor at the hotel’s open terraces at level 4.

Solution

Elmich’s VersiJack® height and slope adjustable pedestals were used to support the raised pavers on The Gate Hotel Tokyo’s open terraces at level 4. Unsightly services are hidden beneath the raised pavers but are readily accessible for maintenance when required. Necessary adjustments for height were made with the screw and locking ring system in the pedestal creating a level surface for members and guests.

Read more

Mandai Bird Paradise

Location

Mandai Wildlife West

Specifications

To establish fire-resistant raised timber decks at the outdoor seating areas of the cafes and restaurants.

Solution

Due to the stringent fire & safety building requirements of this project, a fire-resistant version of VersiJack® (i.e. VersiJack® F FR) height & slope adjustable pedestals and aluminium joists were installed to support the raised timber decks of the outdoor seating areas of the cafes and restaurants. Unsightly services are hidden beneath the raised timber decks but are readily accessible for maintenance when required. Necessary height adjustments were made with the screw and locking ring system in the pedestal, creating a level surface for members and guests.

Read more
Waterproofing Preformed Membrane

Silicon Box Semiconductor Factory

Location

Silicon Box, Singapore

Specifications

To provide a comprehensive waterproofing system for the roof and basements of the factory.

Solution

Waterproofing Products Used (~70,000 m2)

 

Urban Greenery Product Used:

Read more
TrackGard - Event Flooring and Ground Protection

National Day Parade Singapore

Location

The Padang, Singapore

Specifications

To provide temporary ground cover for event areas and pedestrian pathways for National Day Parade spectators, event crew and performers.

Solution

Over 2,580 square metres of TrackGard® (robust portable flooring for temporary access and ground protection) was deployed within the vicinities to create temporary event areas and pedestrian pathways.

The hexagonal design of each TrackGard® tile allows for interlocking supports on all six sides to provide excellent strength and durability for heavy foot traffic. The non-slip surface of TrackGard® prevent accidental slipping due to wet floor conditions brought about by the rain and provided a mud-free walkway for spectators, event crew and performers.

Read more

Surbana Jurong Campus

Location

Surbana Jurong Campus, Singapore

Specifications

To waterproof the rooftop terraces, establish raised wooden decks on the rooftop terraces and provide drainage beneath the planter boxes.

Solution

Waterproofing the Rooftop Terraces (Image 1 to 3)
About 15,000 sq m of Euraplan® (UV-resistant PVC-based waterproofing membrane) was installed on the rooftop terraces.

Outdoor Raised Deck on Rooftop Terraces (Image 4 to 9)
VersiJack® height and slope adjustable pedestals were used to support the outdoor raised decks on the roof top terraces. This decking installation is unique because in addition to the standard parallel raised decks, a rounded circular raised deck was constructed.

Planter Boxes with Irrigation System (Image 10 to 12)
VersiCell® lightweight, high strength modular drainage cells were installed to provide drainage beneath the planter boxes.

Project Credits
Owner: Surbana Jurong
Architect: Safdie Architects
Main Contractor: Boustead Singapore Limited
Decking Installer:  Venturer Pte Ltd
VersiCell® Installer: Nature Landscapes Pte Ltd
Waterproofing Installer: Maxbond Singapore Pte Ltd

Read more
www.elmich.com

The Royal Condominium, Cambodia

Location

The Royal Condominium, Cambodia

Specifications

To provide sub-surface drainage for the Intensive Green Roof on the rooftop of the condominium.

Solution

Elmich VersiCell® 3050 drainage modules (drain cells) were installed beneath the geotextile filter fabric layer and the planting soil above. The drainage cavity created enables rapid transport of excess water to drainage points on the roof, preventing waterlogging at the planter boxes and roof gardens. Laid directly on the waterproofing membrane, the modules also provide a protection layer that prolongs the serviceable life of the membrane.

Read more
www.elmich.com

ArchXpo 2022

Location

Marina Bay Sands Expo & Convention, Singapore

Specifications

To construct a raised floor with safety support panels.

Solution

Raised Floor Installation

VersiScape™ Safety Support Panels supported by VersiJack® height adjustable pedestals were used to construct the raised floor. Porcelain tiles in variable & conventional layouts were laid on half of the VersiScape™ Safety Support Panels, whilst artificial turf occupied the remaining panels.

Project Credits

Porcelain Tiles Supplier: Atlas Concorde Artificial Turf Supplier: TigerTurf VersiJack® & VersiScape™ Manufacturer: Elmich

Read more