Location

Joan Road – Singapore

Specifications

To provide a green wall system for the establishment of an instant mature green wall.

Solution

A metal framework securing the welded mesh was positioned in place. VGP Mesh Brackets were mounted on the horizontal strips of the metal frame to anchor the welded mesh.

The VersiWall® GT (VGT) Pilasters were positioned and firmly fastened using stainless steel bolts. Subsequently, support bolts were installed in preparation for the VGT Trays to be mounted.

Pre-planted VGT Trays were delivered on-site, and mounted on the support bolts.

Irrigation pipes were inserted through the holes of the Pilasters unobtrusively. An automated irrigation system with an integrated control panel enabled delivery of irrigation water and fertilizer to the plants of the green walls at pre-set times and programmed durations.

The VGT green wall totalling 5 sqm installed at the fitted container delivers functional aesthetics, providing thermal insulation and a solution to enhance environmental sustainability.

SPECIFICATION
.