Republic Polytechnic

Republic Polytechnic

Location

Republic Polytechnic – Singapore

Specifications

Evalon® V – all roofs, landscape decks and external decking areas over basement structures including vehicular driveways.

 

Fleximent® 201 – all wet areas, including toilets and water-retaining structures such as water features, reinforced concrete water tanks etc.

Read more

Khoo Teck Puat Hospital

Location

Khoo Teck Puat Hospital – Singapore

Specifications

Evalon® V – all roofs, landscape roofs / decks and external decking areas over basement structures including vehicular driveways, also as exposed membrane on the roof over the Decontamination Room.

 

Fleximent® 201 – wet areas over conventional reinforced concrete slabs and water-retaining structures.

 

Eurathane® 2000 – wet areas over bondek reinforced concrete slabs and corridor narrow pre-cast planters.
Delta® MS20 – Water management application (between slabs drainage) to basement slab. Delta MS20 is installed between the primary basement slab and secondary topping slab.

Read more

Marina Bay Sands Promenade

Location

Marina Bay Sands – Singapore

Specifications

Evalon® V – Promenade Deck including the landscaped areas over basement retail areas.

 

Fleximent® 201 – additional waterproofing treatment for detailing purposes at M&E penetration areas of Evalon® V membranes.
Delta® MS20 – Water management application (between slabs drainage) to basement slab. Delta MS20 is installed between the primary basement slab and secondary topping slab.

Read more

VivoCity

Location

Vivocity – Singapore

Specifications

Evalon® V – installed at the roofs and external decking areas, 1st Storey driveway deck and Taxi Pick-up/Drop-off over basement structures, 3rd Storey timber and pebble-washed finish deck, landscape deck and water features.

 

Eurathane® 2000 – all wet areas, including toilets, M&E rooms and 2nd Storey external corridor areas.

 

Fleximent® 201 – water-retaining structures, including reinforced concrete water tanks and water features.

Read more

United World College of South East Asia

Location

United World College of South East Asia – Singapore

Specifications

To provide waterproofing membrane protection prior to casting and under-screed drainage to allow entrapped water in the screed to discharge at the sports courts of the college on the roof of the building housing the bus parking bays.

Solution

VersiDrain 6P sheets, installed prior to casting over the waterproofing membrane, offers immediate protection against inadvertent membrane penetration or damage due to installation of various services at the promenade. Waterproofing is provided by a fully adhered layer of Avalon PVC/EVA terpolymer membrane. VersiDrain 6P is covered with geotextile fabric followed by a reinforcing wire mesh on top.

 

The capillary break created by the sheets between structural slab and topping screed prevents water and salts in the screed from migrating upward and also releases hydro-static pressure by allowing the trapped water and dissolved salts to discharge, minimising efflorescence and possibility of cracking on the surface.

Read more

Marina Bay Sands Promenade.

Location

Marina Bay Sands Waterfront Promenade – Singapore

Specifications

To provide waterproofing membrane protection prior to casting and installation of granite pavers along the Waterfront Promenade and facilitate under-screed drainage to allow entrapped water in the screed to discharge.

Solution

VersiDrain 6P sheets, installed prior to casting over the waterproofing membrane, offers immediate protection against inadvertent membrane penetration or damage due to installation of various services at the promenade. Waterproofing is provided by a fully adhered layer of Evalon PVC/EVA terpolymer membrane. VersiDrain 6P is covered with geotextile fabric followed by a reinforcing wire mesh on top.

 

The capillary break created by the sheets between structural slab and topping screed prevents water and salts in the screed from migrating upward and also releases hydro-static pressure by allowing the trapped water and dissolved salts to discharge, minimising efflorescence and possibility of cracking on the surface.

Read more

School of Art, Design and Media, Nanyang Techological University

Location

School of Art, Design and Media, Nanyang Technological University – Singapore

Specifications

To provide waterproofing for 3 curved landscape roofs.

Solution

Waterproofing membrane (Evalon®) was installed on 3 curved landscape roofs. The landscape roofs create additional open amenity space, insulate the building, cool the surrounding air and assist in harvesting rainwater for landscaping irrigation. The curving green roofs blend landscape and structure, nature and high-tech with an organic and vegetated form that distinguishes the building from among the other structures on campus.

Read more

School of Biological Science, Nanyang Technological University

Location

School of Biological Science, Nanyang Technological University – Singapore

Specifications

To provide under-screed drainage and a capillary break preventing moisture and salts below the sheet from migrating to the surface.

Solution

VersiDrain 6P sheets were installed over structural slab prior to application of the topping screed and installation of the surface decorative pavers. The sheets positioned between structural slab and topping screed prevents water and salts in the screed from migrating upward via capillary action minimising efflorescence on the pavers above.

Read more

Tropical Marine & Science Institute

Location

Tropical Marine & Science Institute – Singapore

Specifications

To provide under-screed drainage to allow entrapped water in the screed to discharge as well as protect waterproofing membrane.

Solution

VersiDrain 6P sheets were installed over the waterproofing membrane offering immediate membrane protection prior to casting. Insulation boards were positioned over VersiDrain 6P and covered with geotextile fabric followed by a reinforcing wire mesh on top. Efflorescence is minimised as the drainage sheets positioned between structural slab and topping screed prevent water and salts in the screed from migrating upward via capillary action and crystallizing on the surface.

Read more
Pages:«123