Preparation of Installation Area
1.Ensure that substrate must be smooth and even. 2.Ensure that fall is towards drainage outlet/s. 3.Protect VersiDrain® 6 P-Anchor® from excessive UV exposure by storing under tarpaulin or under shade when time from delivery to installation exceeds one week. Lay Under-screed Drainage Mats
1.Position drainage mats with studs down directly on substrate/waterproofing membrane. 2.Align and snap on interlocking pins and corresponding interlocking holes of adjacent mats to form a continuous carpet over installation area. 3.Cut mats with shears to size or to fit into corners, plinth areas or curved areas, drainage gully or as necessary. Geotextile, Wire Mesh & Cement Screed
1.Lay Geotextile according to project requirements. 2.Lay wire mesh above drainage mats according to project requirements. 3.Apply cement screed according to project requirements.